Studio Log 260729

//49 DAYS TO OPENING

Started the day refining the cap for the column cavities and finalized the actual sensor box print.
Managed to create a clean setup for the column electronics!

A trip to home depot to check sizing if concrete slabs, get construction adhesive, wago lever nuts and some other tidbits while returning older set screw couplings and ring terminals.

Turns out what i thought was a 1.5 inch column was actually 1.25! So now i’m deciding between redoing my work for a 1.5 or just pivot to 1.25.

There’s a popeyes next to home depot so don’t blame me for snagging a spicy chicken sandwich.

Did a mix session for Samtara (and had done tacos) before wrapping up the day