Studio Log 260808

//40 DAYS TILL OPENING

finished the first complete column today. from the sleeve at the base to hold it steady, to the clamping mechanism for the sensor, the box fitting, and the hood to hide and clamp everything down.

spent the afternoon building more sensor boxes for the floor columns. pretty much done with four of them, and the other 2 are printed and ready. my wire strippers are absolutely shit when trying to work with the 26-28 awg wires so I ordered a better pair and decided to leave the remaining 2 floor column boards till after I have it.

currently the sleeves are being printed. and maybe ill manage to put the 2 remaining hoods to print overnight. after that its just assembling the columns.

worked on the zykr live set for friday after and its coming along. all the lights are ported and setup to be a mix of the older style programming from 2023 and the newer scenes i wrote last month.

didnt get a chance to go by the plant store or home depot - probably monday