Studio Log 260807

//41 DAYS TILL OPENING

what a week it's been.
for starters I got all the materials ! Marek offered me a ride to home depot on wednesday and I got everything. All the cinder blocks, concrete plinths, EMT rods.

im playing a zykr show next friday and then a solo acoustic show on sunday, so I had to start building those sets too.

and some of the studio time has gone into writing max for live patches to transfer the lighting programming from 2023 shows to the new touchdesigner DMX setup. but I'm more or less done with it, and aside from practicing the set I think my focus is going to be back to the install.

speaking of, the 3d printer is currently printing the hood caps for the columns, and i managed to cut all the piping today with Tushar's help.

i haven't updated the log but the altar is underway too.

tomorrow im going to build out the circuit and sensor boxes for the 4 corner columns, print out the bottom sleeves and hopefully have them built by EOD.

I also want to go by the plant store tomorrow to confirm the plants I intend to use for this install, and also see if i can source a few nursery pots to start modeling the collars for these planters in the cinder blocks.